Hello! Welcome to our official website!
Engineering Cases
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a photovoltaic charging carport project for Xinyang Expressway Service Area. The carport adopts a double-cantilever structure, with 4 groups, each about 12m wide and 50m long, covering about 2,400㎡ in total. The structure is designed for a 50-year service life, using Q355 steel and 10.9-grade high-strength bolted connections, with seismic performance higher than the local fortification intensity. The total project period was about 45 days, with on-site construction completed in about 15 days.
Henan Jingtian completed a membrane structure frame design and fabrication project for a non-motor vehicle shelter in Zhengzhou. The shelter is about 6m wide and 30m long, used for electric bike and bicycle parking, sunshade, and rain protection. Jingtian provided membrane steel frame design, component fabrication, welding, and surface treatment to create a stable support system for later membrane installation.
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a membrane structure entrance building project for Zhengzhou Foxconn Park. The project includes 6 large-span entrance structures for sunshade, aesthetics, and park image enhancement. Pipe truss beams were used as the main load-bearing system. Jingtian provided design, fabrication, and on-site installation service in China, and can provide fabrication, packaging, shipment, installation drawings, and remote technical guidance for overseas projects.
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a steel structure factory expansion project in Shanxi, providing integrated design, fabrication, and installation service. The factory is about 30m high, with a land area of about 3,000㎡ and a building area of about 6,000㎡. After site investigation of the existing factory structure, Jingtian developed a reinforcement and expansion solution using pipe truss columns as main load-bearing members to ensure structural stability and control cost.
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a membrane structure entrance gate for the underground entrance in front of Xinyang East High-Speed Railway Station Plaza. The project is about 6m wide and 18m long, covering about 84㎡. It adopts a cap-style membrane structure, using 1050 model membrane material, Q235 steel, primer and topcoat treatment. The project period was about 20 days, with on-site installation completed in about 5 days.