Hello! Welcome to our official website!
Engineering Cases
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a warehouse steel structure canopy project in Pingdingshan. The canopy is about 11m wide and 40m long, covering about 440㎡. The main frame uses galvanized square tubes, while the roof combines color steel sheets with daylight panels. One daylight panel was installed between every two color steel sheets to improve natural lighting. The project used 15-year warranty materials, with a total period of about 15 days and on-site installation completed in about 5 days.
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a 72㎡ non-motor vehicle membrane carport project for Talent Building. The carport has a 6m span and 12m length, with a charging pole installed in the center. It uses 1050 model membrane material, Q235 steel, epoxy primer, and fluorocarbon topcoat, offering parking, charging, sunshade, and rain protection functions for office building areas.
Talent Building Non-Motor Vehicle Membrane Carport Project | 72㎡ Charging Carport - Jingtian
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a photovoltaic charging carport project for Xinyang Expressway Service Area. The project covers about 1,800㎡, with 6 carport groups, each about 6m wide and 50m long. The structure is designed for a 50-year service life, using Q355 steel and 10.9-grade high-strength bolted connections, with seismic performance higher than the local fortification intensity. The total project period was about 45 days, with on-site construction completed in about 15 days.
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a rooftop cantilever membrane canopy project on a 15m-high building. After site investigation, the existing wall was found unsuitable for direct load support, so Jingtian added pipe truss load-bearing columns at 6m intervals and installed horizontal pipe truss beams to complete the canopy. The project used 1050 model membrane material, Q235 steel, primer and topcoat treatment, with lifting installation and a construction period of about 15 days.
Rooftop Cantilever Membrane Canopy Project | 15m High Building with 6m Extension - Jingtian