Membrane Structure Engineering
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a membrane structure entrance gate for the underground entrance in front of Xinyang East High-Speed Railway Station Plaza. The project is about 6m wide and 18m long, covering about 84㎡. It adopts a cap-style membrane structure, using 1050 model membrane material, Q235 steel, primer and topcoat treatment. The project period was about 20 days, with on-site installation completed in about 5 days.
Henan Jingtian Membrane Structure Engineering Co., Ltd. completed a 72㎡ non-motor vehicle membrane carport project for Talent Building. The carport has a 6m span and 12m length, with a charging pole installed in the center. It uses 1050 model membrane material, Q235 steel, epoxy primer, and fluorocarbon topcoat, offering parking, charging, sunshade, and rain protection functions for office building areas.
Talent Building Non-Motor Vehicle Membrane Carport Project | 72㎡ Charging Carport - Jingtian